PROJECT DEVELOPMENT ROADMAP
From Concept to Commercial Operation
A structured seven-phase development program designed to progressively address technical, commercial, environmental and financing risks, advancing the Mombo Alumina Refinery Project from initial development through engineering, construction, commissioning and commercial operations.
Advancing from concept to implementation
Seven structured phases take the project from resource verification to commercial operation, progressively reducing technical, commercial, environmental and financing risk.
Our programme is moving through resource verification, metallurgical test work, feasibility and engineering, infrastructure planning, environmental and social assessment, market development and financing, with each step taking the refinery closer to construction and operation.
A disciplined path forward.
- Phase 1
Resource and metallurgical verification
Geological drilling, sampling, independent resource estimation, bauxite-quality analysis and Bayer-process test work.
Outcome: Confirms that our bauxite supply can support the refinery and sets the technical parameters for design.
- Phase 2
Pre-feasibility and feasibility studies
Mine planning, process selection, mass and energy balances, water, logistics and infrastructure studies, and cost estimation.
Outcome: Turns the concept into a detailed project design and confirms its technical and economic strength.
- Phase 3
Front-end engineering design
Detailed process design, equipment specifications, utilities, site layout and capital and operating cost estimates.
Outcome: Produces the engineering package used for cost estimates, procurement and EPC tenders.
- Phase 4
Bankability preparation
Bankable feasibility study, independent technical review, market validation, offtake agreements, ESIA and financial-model audit.
Outcome: Assembles the complete information package investors and lenders need to commit funding.
- Phase 5
Financial close
Financing agreements, equity commitments, EPC contract, offtake arrangements and security package.
Outcome: Secures the funding, contracts and agreements needed to start construction.
- Phase 6
Construction and installation
Site preparation, mine development, refinery construction, utilities and logistics infrastructure.
Outcome: Builds the mines, refinery, utilities and logistics infrastructure.
- Phase 7
Commissioning and ramp-up
Commissioning, performance testing, workforce readiness and ramp-up to full commercial production.
Outcome: Brings the refinery to full commercial production of 1.0 million tonnes of alumina per year.